ISO 9001 factory · 48-hour samples · OEM / ODM welcome

Built for production programs ISO 9001:2015 CE · RoHS · REACH 40+ export markets 100% final testing 48-hour samples 2 years Warranty
Manufacturing & quality

Engineering support from prototype to production.

Gear cutting, motor winding, assembly and final testing are coordinated in one factory — so lead times stay short and quality stays consistent from sample to production.

2009Founded
15,000 m²Production area
260+Team members
100k+Monthly capacity
Why PLTBR

A supplier that answers within one working day.

48-hour samples

1–5 piece prototypes ship within 48 hours; production lead times of 15–25 days.

100% final testing

No batch sampling — every gearbox and motor runs noise, backlash, torque and runout checks.

OEM & ODM welcome

Custom shafts, windings, cables, flanges and private-label packaging — no minimum for prototyping.

Common questions

The details that help you decide.

What are the sample and production lead times?
Prototype samples in 1–5 pieces ship within 48 hours. Production orders typically take 15–25 days, depending on configuration.
Can you customize shafts, windings and flanges?
Yes. OEM options include custom shafts, flanges, motor windings, cables and private-label packaging.
How do I choose a motor and gearbox combination?
Share your load, speed, duty cycle, available space and positioning needs — an application engineer will help narrow down the frame and ratio.
What are your payment and shipping terms?
We accept T/T, L/C and PayPal, and ship FOB, CIF, DDP or EXW. MOQ is 1 piece for samples and 100 pieces for OEM production.
Start a project

Let's size the right drive for your application.

Send the basic requirements and our team will follow up with a recommendation and quotation within one business day.

  • Email: yong.zhao@live.cn
  • Response: Within one business day
  • Location: Chongqing, China

Request a quote

WhatsApp · +86 138 8358 2185